logo
Latest company case about
Solutions Details
Created with Pixso. Home Created with Pixso. Solutions Created with Pixso.

Offshore Oil & Gas Corrosion Challenge in Norway

Offshore Oil & Gas Corrosion Challenge in Norway

2025-12-27

Offshore Oil & Gas Corrosion Challenge in Norway


Client: Norwegian engineering firm for a North Sea offshore platform upgrade.


Challenge: Required super duplex stainless steel (UNS S32750) seamless tubes for high-pressure, chloride-rich seawater service. Needed to withstand extreme pressure (15,000 psi) and resist pitting/crevice corrosion.


Our Solution: Supplied hot-extruded and cold-finished super duplex tubes with solution annealing and quench treatment. Provided critical pitting temperature (CPT) test reports and IGC (intergranular corrosion) test certificates as per NORSOK M-650.


Result: Tubes installed in the platform's crucial seawater injection system. Zero failure reported after 18 months of service.
Client Testimonial (Project Engineer, Ms. Hansen): "The technical support was exceptional. They helped our engineers select the right grade and provided all necessary compliance data for Norwegian petroleum standards. Reliability is non-negotiable offshore, and their product delivers."

Latest company case about
Solutions Details
Created with Pixso. Home Created with Pixso. Solutions Created with Pixso.

Offshore Oil & Gas Corrosion Challenge in Norway

Offshore Oil & Gas Corrosion Challenge in Norway

2025-12-27

Offshore Oil & Gas Corrosion Challenge in Norway


Client: Norwegian engineering firm for a North Sea offshore platform upgrade.


Challenge: Required super duplex stainless steel (UNS S32750) seamless tubes for high-pressure, chloride-rich seawater service. Needed to withstand extreme pressure (15,000 psi) and resist pitting/crevice corrosion.


Our Solution: Supplied hot-extruded and cold-finished super duplex tubes with solution annealing and quench treatment. Provided critical pitting temperature (CPT) test reports and IGC (intergranular corrosion) test certificates as per NORSOK M-650.


Result: Tubes installed in the platform's crucial seawater injection system. Zero failure reported after 18 months of service.
Client Testimonial (Project Engineer, Ms. Hansen): "The technical support was exceptional. They helped our engineers select the right grade and provided all necessary compliance data for Norwegian petroleum standards. Reliability is non-negotiable offshore, and their product delivers."