Solar Thermal Power Plant in UAE

Solar Thermal Power Plant in UAE

2025-12-27

Solar Thermal Power Plant in UAE


Client: EPC contractor for a concentrated solar power (CSP) plant.


Challenge: Required high-temperature 321H stainless steel seamless tubes for solar receiver heat exchanger panels. Tubes needed to withstand cyclic thermal stress (from ambient to 550°C daily) and maintain structural integrity for 25+ years.


Our Solution: Supplied solution-annealed 321H tubes with guaranteed high-temperature tensile strength and scaling resistance. Provided extensive heat lot traceability and positive material identification (PMI) reports.


Result: The tubes were successfully installed and have been operating within performance parameters since the plant's commissioning.


Client Testimonial (Project Director, Mr. Al-Mansoori): "In the desert environment, material failure is not an option. Their technical team worked closely with us on the specifications. The product's performance in extreme thermal cycling has been excellent."

Latest company case about
Solutions Details
Created with Pixso. Home Created with Pixso. Solutions Created with Pixso.

Solar Thermal Power Plant in UAE

Solar Thermal Power Plant in UAE

2025-12-27

Solar Thermal Power Plant in UAE


Client: EPC contractor for a concentrated solar power (CSP) plant.


Challenge: Required high-temperature 321H stainless steel seamless tubes for solar receiver heat exchanger panels. Tubes needed to withstand cyclic thermal stress (from ambient to 550°C daily) and maintain structural integrity for 25+ years.


Our Solution: Supplied solution-annealed 321H tubes with guaranteed high-temperature tensile strength and scaling resistance. Provided extensive heat lot traceability and positive material identification (PMI) reports.


Result: The tubes were successfully installed and have been operating within performance parameters since the plant's commissioning.


Client Testimonial (Project Director, Mr. Al-Mansoori): "In the desert environment, material failure is not an option. Their technical team worked closely with us on the specifications. The product's performance in extreme thermal cycling has been excellent."